1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vedmedyk [2.9K]
3 years ago
15

Juan is hiking up a mountain starting at an elevation of 800 800 feet. Every hour, he is 2000 2000 feet higher in elevation.

Mathematics
2 answers:
Rina8888 [55]3 years ago
8 0
The final one would be correct. You start with the initial value of 800 and move upward 2,000 each hour he spends climbing.
Gelneren [198K]3 years ago
8 0

Answer:

Option d. h(t) = 2000t + 800

Step-by-step explanation:

Juan is hiking up a mountain starting at an elevation of 800 feet.

Every hour he gains an elevation of 2000 feet.

So we have to find a function for h(t) where is the time and h is the height.

Since Juan gains height in 1 hour = 2000 ft.

therefore, height gained in t hours = 2000 ft.

He started hiking from 800 ft so total height after t hours will be 2000t + 800

In the form of a function h(t) = 2000t + 800

Option d. is the answer.

You might be interested in
What are two`fractions whose product is -3/5
natali 33 [55]
7/5 - 10/5 = -3/5

I hope this helps. 
3 0
3 years ago
Plzzz help right answer gets a brainly!
blondinia [14]

Answer:

the answer is the second choice

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Sally works as an estimator for​ G&J Electric. She has determined that 550 feet of electrical cable will be needed to wire a
GuDViN [60]

Given :

Initial length of electric cable needed, L=550\ ft.

Later, Sally is told that the homeowner has decide to cut back from a​ three-car garage to a​ two-car garage, which will eliminate two branch​ circuits, one of 23 feet and the other of 34 feet.

To Find :

How many feet of wire will be needed​ now.

Solution :

Wire needed is given by :

Required = Total wire - ( length of 1nd branch + length of 2nd branch )

Required = 550 - ( 23 + 34 )

Required = 550 - ( 57 ) ft

Required = 443 ft

Therefore, length of wire required is 443 ft.

Hence, this is the required solution.

7 0
3 years ago
Points Points Points
alex41 [277]
Yesyesyes thank you have an amazing day!
3 0
3 years ago
Read 2 more answers
What’s the answer plz I don’t want to fail
tresset_1 [31]

Answer:

much thinner

Step-by-step explanation:

#first

3 0
3 years ago
Read 2 more answers
Other questions:
  • Can or can not 385/22 be simplified
    11·2 answers
  • Mr Thomason had a balance of $283.12 in his checking account at the beginning of the month he wrote checks for $23.09, $7.56, $1
    8·2 answers
  • If two students from the high school are chosen at random, one after the other, to represent the school at a leadership conferen
    5·2 answers
  • Use the equation e^x+e^-x/e^x-e^-x=t tosolve for x
    12·2 answers
  • The weight of male students at a certain university is normally distributed with a mean of 175 pounds with a standard deviation
    10·1 answer
  • Martha is making a quilt. She has 63 squares ready to sew together. She wants the quilt to be 9 rows long. How many squares will
    12·1 answer
  • Consider the two-way table.   Group 1 Group 2 Category A 36 20 Category B 12 35 Complete the table below to show the relative fr
    15·2 answers
  • Plsss help if you can! I will mark you brainliest, give thanks, and 5 stars, and friend invite if you are correct!!
    15·2 answers
  • Please refer to the attachment​
    12·1 answer
  • Helpp please will mark brainlest
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!