First divide the rocks per 3/4 of an hour by 3 and multiply by 4 to get the production per hour. then subtract the already moved rocks from the total job and divide the answer by 16 (the rocks moved per hour) getting the time needed to move the rest
Answer:
66
Step-by-step explanation:
Seventy Thousand plus Four Hundred Thousand plus Ten Thousand plus Eight Thousand plus Five Hundred plus Thirty plus Nine.
Answer:
12
Step-by-step explanation:
6 are striped which is half of them, the other half must be 6 then
6+6=12
The minimum distance between the asteroid and the sun is 10 - 6 =4
The given hyperbolic path defined as
divide both the sides by 576,
The general equation of
hyperbola is written as
;
Compare with above mention equation
Here
The distance between the asteroid and the sun is seen by figure -1
or
⇒c =10
The minimum distance between the asteroid and the sun is 10 -6 =4