Answer:
D.$400 over allocated
Explanation:
For computing the over-allocated or under-allocated amount, first, we have to determine the predetermined overhead rate which is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)
= $371,000 ÷ 180,000 hours
= $2.06
Now we have to find the actual overhead which equals to
= Actual direct labor-hours × predetermined overhead rate
= 190,000 hours × $2.06
= $391,400
So, the ending overhead equals to
= Actual manufacturing overhead - actual overhead
= $391,000 - $391,400
= $400 over - applied
Answer:
the correct answer is D, product market.
Explanation:
<span>Buying a bond does not constitute ownership in a company. In the event that Touchtech, or any firm that issues a bond, runs into financial difficulty, bondholders are the first to be paid. Sean, as a bondholder, would be among the first paid.</span>
Answer:
Building with fair value of $150,000
Explanation :
In the consolidation work paper elimination, we eliminate the Equity or Net Identifiable assets that exist in Star Company at the Acquisition Date.
The Building with fair value of $150,000 was the only balance sheet item existing thus this is ultimately the Net Identifiable Assets that would be eliminated.