Answer:
7.5kg
Step-by-step explanation:
Given that:
Monday:
Mass of sand = 24 kg
Mass of cement = 5 kg
Tuesday :
Mass of sand = 36 kg
Let mass of cement = c
Mass of cement required to make the same type of mortar mix
Mass of Sand = mass of cement
24kg = 5kg
36kg = c
By cross multiplication :
24 * c = 5 * 36
24c = 180
Divide both sides by 24
c = 180 / 24
c = 7.5 kg
Hence mass of cement required is 7.5 kg
Answer:
The pattern is that they are multiplying by -3 every time. 81*-3 = -243
Independent is hour
Dependent is her rate ($18) because it DEPENDS on how long she works
Answer:
Tristan will need 32 feet of material for the perimeter of the garden.
Step-by-step explanation:
Given that
Area of square garden = A = 64 square feet
Perimeter = P = ?
We know that for calculation of perimeter, length of side of square is required which is not directly given in the question. The area will be used to calculate length of side and then length will be used to calculate the perimeter.
So,

s is for side
Putting the value of area

Taking square root on both sides

The length of side is 8 feet.
Perimeter will be:

Hence,
Tristan will need 32 feet of material for the perimeter of the garden.