The guard prevents you from touching the blade.
Answer:
Multistage Sampling.
Explanation:
Multistage Sampling -
It is the method of sampling , where samples are taken in small portion , at every level of the sampling process , is referred to as multistage sampling.
It is quite a complex method , which require dividing the population into groups , and then further sampling is done, hence it is a long process and require a lot of time.
Hence, from the question, the type of sampling method involved in the question is multistage sampling.
Answer:
2 days freight
Explanation:
The computation is shown below:
The compression is done by considering the holding cost
Holding cost = 2,125 items shipped × $9 per unit
= $19,125
Time Savings = 3 days
Now
Holding Cost for 3 days = $19,125 × (3 days ÷ 365 days )
= 157.19
This is more than than the given amount i.e $145
Therefore, it is advisable to go for 2 days freight as it contains the less amount as compared to 5 days
Answer:
Worth of the Bond today = $2,030.3
Explanation:
<em>The worth the bond today is the present value of the expected future lump sum cash receivable in year 5 discounted at the going interest rate of 4.25%.</em>
The formula below would be of help to resolve this ;
PV = FV× (1+r)^(-n)
PV- Present Value/Worth of the Bonds- ?
FV- Future value i.e expected cash receivable- 2,500
r- discount rate - 4.25%
n- maturity period of the bond- 5
PV = 2,500 × (1+0.0425)^(-5)
PV = 2,030.29
Worth of the Bond today = $2,030.3