Answer:
its 4
Step-by-step explanation:
Answer:
b. 1.15
Step-by-step explanation:
The z statistics is given by:

In which X is the found proportion, p is the expected proportion, and s, which is the standard error is 
Out of 53 teachers who replied to the survey, 13 claim they are satisfied with their job.
This means that 
She find that the proportion of satisfied teachers nationally is 18.4%.
This means that 
Standard error:
p = 0.184, n = 53.
So

Z-statistic:



The correct answer is:
b. 1.15
Answer: -12
Step-by-step explanation:
Change to
-7-5 and there is your answer.
ANSWER
93 and 70
EXPLANATION
We have that one number is 23 more than another.
Let the first number be x.
Let the second number be y.
This means that:
x = 23 + y ____(1)
The sum of the two numbers is 163. This means that:
x + y = 163 ____(2)
Put (1) in (2):
23 + y + y = 163
23 + 2y = 163
2y = 163 - 23
2y = 140
y = 140 / 2
y = 70
From (1):
x = 23 + 70
x = 93
The two numbers are 93 and 70.
Answer:
1. 
3.
(undefined slope)
5. 
7. 
Step-by-step explanation:
slope (m)
rate of change (r)
1. m =
3. m =
(undefined slope)
5. m = 
7. r = 
Hope this helps!