1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
mrs_skeptik [129]
3 years ago
7

Solve the linear equation of 2x-5=3x-(2+x)​

Mathematics
2 answers:
AfilCa [17]3 years ago
8 0

Step-by-step explanation:

2x - 5 = 3x - (2 + x)

2x- 5 = 3x - 2 - x

2x - 5 = 3x - x - 2

2x - 5 = 2x - 2 (-2x and + 5)

2x - 2x - 5 +5 = 2x - 2x - 2 + 5

0 - 0 = 0 + 3

0 = 3 (This equation is uncorrect)

grigory [225]3 years ago
5 0
-x - 2 = -1• (x + 2)
solve : -x = 2
Add 2 to both sides of the equation :
-x = 2
Multiply both sides of the equation by (-1) : x = -2
You might be interested in
A doughnut shop charges $0.80 for each doughnut and $0.40 for a carryout box. How many doughnut can Mr. mac buy if he wants to s
Mandarinka [93]
The answer would me 4.33 if you do it on a calculator
7 0
4 years ago
Read 2 more answers
2. A farm lets you pick 3 pints of raspberries for $12.00.
Svetlanka [38]
Here is part of it I’ll send the other part now

6 0
3 years ago
Read 2 more answers
How? Do you do this??
Gre4nikov [31]
X=5/2,x=2  
i cant explain it but if you got to symbolab.com and input the equation it will solve and show you the steps
5 0
3 years ago
Read 2 more answers
Solve the following equation. Then placed a correct number in the box provided. -13 - 3x = -10
Alisiya [41]

Answer:

x=-1

Step-by-step explanation:

-3x=-10+13 - -3x=3 - -3 = -1

5 0
4 years ago
Machine A can complete a certain job in x hours. Machine B can complete the same job in y hours. If A and B work together at the
scZoUnD [109]

Answer:

\frac{y}{x+y}

Step-by-step explanation:

The required answer is the rate at  which Machine A  works when the two machines are combined.

Note: the rate of doing work is express as

rate=\frac{1}{time taken} \\

Hence we can conclude that Machine A working rate is

machine A=\frac{1}{x} \\ and machine B working rate is

machine B=\frac{1}{y} \\

When the two machine works together, the effective working rate is

\frac{1}{x}+\frac{1}{y}\\\frac{xy}{x+y}\\

The fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A

Hence the fraction of work done by A is expressed as

\frac{1}{x}*combine working rate

\frac{1}{x}*\frac{xy}{x+y}\\\frac{y}{x+y} \\

Hence the fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A is \frac{y}{x+y} \\

6 0
3 years ago
Other questions:
  • For what value of x^2 is x+2x=24
    7·1 answer
  • Rebecca's $5000 CD is nearing its maturity and will have a maturity value of $6101.89. The renewal rate for her CD will be at a
    12·2 answers
  • 5. $185 TV with 8.5% tax​
    8·2 answers
  • The length of a rectangle is 4yd longer than its width. If the perimeter of the rectangle is 36yd, find its area
    11·1 answer
  • in an isosceles triangle the base angles are 30 degrees lass than the other angle. what is the measure of the third angle?​
    9·1 answer
  • Can someone help me please ​
    6·1 answer
  • Explain how to perform a​ two-sample z-test for the difference between two population means using independent samples with sigma
    15·1 answer
  • 19 lbs of onions cost $171. How many lbs of onions can you get with $270 ?​
    8·2 answers
  • What is the next number of 1 2 6 17 47 ?<br>and how?!​
    15·1 answer
  • When looking at a graph of a system of equations,
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!