Answer:
Overhead absorption rate
= Overhead absorbed/Actual labour cost x 100
= $4,400/$800 x 100
= 550% of direct labour cost
Explanation:
Since the overhead absorbed is $4,400, there is need to divide the overhead absorbed by actual direct labour cost multiplied by 100. This gives the overhead application rate.
Answer:
3.73%
Explanation:
The computation of the rate of interest that makes the equivalent is shown below:
As we know that
Present value=Cash flow × Present value discounting factor ( interest rate% , time period)
Let us assume the interest rate be x
where,
Present value of $400,000 is
= $400,000 ÷ 1.0x ^5
And,
Present value of $1,000,000 be
= $1,000,000 ÷ 1.0x^30
Now eqaute these two equations
$400,000 ÷ 1.0x^5 = $1,000,000 ÷ 1.0x^30
(1.0x^30) ÷ (1.0x^5) = $1,000,000 ÷ $400,000
1.0x^(30 - 5)=2.5
1.0x^25=2.5
1.0x = (2.5)^(1 ÷ 25)
x =1.03733158 - 1
= 3.73%
Answer:
$10,200,000.
Explanation:
End inventory + Sales - Begin inventory = # of units that need to be produced
# of units that need to be produced @ $30 per = Your answer
Answer:
$15,730
Explanation:
<em>under absorption costing overheads are charged to product units using an overhead absorption rate. </em>
The overhead absorption rate is determined using the formula below:
<em>Overhead absorption rate is = Budgeted Overheads / budgeted Labour hours</em>
Factory overhead Absorption rate (OAR)= $118,800/10,800
= $11 per hour
Amount of 0verhead to charge Number number 117
= 11 × 1,430
= $15,730