It should be Cordinate one
Answer:
88
Step-by-step explanation:
5GP= BP
2BNP= GNP
BP+BNP=333
GP+GNP=225
BNP= 333-BP
BNP= 333-5GP
GP= 225-GNP
GP= 225-2BNP
BNP=333-5(225-2BNP)
BNP=333-1125+10BNP
-9BNP=-792
BNP=88
Hope it helps :)
Mark Brainliest if possible.
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Triangle ABC has vertices at A(3, 8) , B(11, 8) , and C(9, 12) . Triangle FGH has vertices at F(1, 3) , G(9, 3) , and H(7, 7) .
Alex17521 [72]
Hmm, (x,y)
x is horizontal or left right
y is vertical or up down
so
we see that A to F is move left 2 and down 5
B to G is left 2 and down 5
C to H is left 2 and down 5
so translatete ABC left 2 and down 5 and
translate FGH right 2 and up 5
not 1st option
2nd works
3rd works
4th is false
2nd and 3rd
0....1/4..... 2/4 or 1/2 ..... 3/4..... 1.... 1 1/4.... 1 2/4 or 1 1/2...... 1 3/4..... 2.... and so on and so on