Paladinen [302]
4 years ago
6

M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.

(Note: when using the Z tables – round your Z values to two decimal placesbefore getting the probabilities from the tables. DO NOT round standard deviations prior to calculating Zvalues)NOTE: Enter probabilities as decimals (i.e 92.31% should be entered as 0.9231)a) What is the probability that the project will require at least 19 months? (Enter 4 decimal placesfrom distribution tables)b) What is the probability that the project will be completed within 24 months? (Enter 4 decimalplaces from distribution tables)c) What is the probability that the project will require at least 21 months? (Enter 4 decimal placesfrom distribution tables)d) What is the probability that the project will be completed within 15 months? (Enter 4 decimalplaces from distribution tables)e) What is the probability that the project will take between 16 and 24 months to complete? (Enter4 decimal places from distribution tablesShow Work
Mathematics
1 answer:
snow_tiger [21]4 years ago
8 0

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

You might be interested in
A rectangular storage box is 12 in.
ludmilkaskok [199]

Answer:

846 sq. in.

Step-by-step explanation:

This is surface area. There are 6 faces. Solve each face and then add them up. In this case, first multiply 9 and 12 = 108. 108 adding 108 because there is another side with the same size. Than multiply 9 and 15. 135 times 2. 216 + 270 = 486. Next you multiply 12 and 15. 180 times 2. 486 + 360 = 846

8 0
3 years ago
Help pls ASAP I’ll help u in return!!!!!!
Ad libitum [116K]

X/y=4

You can put it as:

y=1/4.x

Hope you get it!

4 0
4 years ago
Sally eats 3/4 of an Apple in 3/5 of a minute. How much time will it take her to eat a full apple
yawa3891 [41]

Answer:

45 seconds

Step-by-step explanation:.

7 0
3 years ago
What are the 4 letters
sammy [17]

Answer:

BGHA

Step-by-step explanation:

You have to find all of the coordinates first in the order they are written:

(0,4)

(-4,3)

(2,0)

(0,-1)

Now use the code at the right to find the letters for each coordinate:

(0,4) B

(-4,3) G

(2,0) H

(0,-1) A

Now write it in this order (all caps): BGHA.

Hope it helps and is correct!

4 0
3 years ago
Read 2 more answers
You are installing a wood fence. The fence is 120 feet long. East wood slat to be installed vertically, is 3 3/4 inches wide. Wh
ddd [48]
3 3/4 inches = (3 3/4 / 12) feet = 0.3125 feet
120 feet requires  ------- x number of board.

120 feet/0.3125 feet / board = 384 boards.

1 board costs 1.40 
384 boards cost x

1.4 * 384.00= x*1 = x
537.60 dollars.

Note if you need to do this by dimensional analysis, it will look like this.

120 feet/fence [ 1 board / 3.75 inches] [ 12 inches/foot] [1.40 dollars / board]

All units that can be cancelled should be.
The result is 537.6 dollars / fence which is the answer you got. 

3 0
3 years ago
Other questions:
  • Please help me with this
    12·1 answer
  • Someone know this???! I need help!
    7·1 answer
  • Save You More offers a buy one/get one free item each week. Customers who purchase only one of the items must pay the regular pr
    10·1 answer
  • What are 3 different ratios that are equivalent to 7:3 ?
    6·1 answer
  • the volume of a cube is increasing at a constant rate of 824 cubic centimeters per minute. At the instant when the volume of the
    11·1 answer
  • The given equation has been solved in the table. Step Statement 1.) 3x - 10 = -16 2.) 3x - 10 + 10 = -16 +10 3.) 3x = - 6 4.) 3x
    7·1 answer
  • How I do this?<br> 3x+4y=11<br> X-2y=-3
    7·1 answer
  • Determine how many solutions the equation has. If one solution, state the value of x.
    11·1 answer
  • A bank records deposits as positive numbers and withdrawals as negative numbers.
    15·1 answer
  • The table of values shows the height of a buoy compared to the sea floor over time as the tide goes in and out. This can be mode
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!