Answer:
Total Variable Cost, Variable Cost Per Unit
Explanation:
- The increase of the activity is associated with the increase of the total variable costs and costs per the unit and is the sum of the variable cots of each individual product developed and is obtained by multiplying one unit of the variable cost to the products.
Answer:
Feb. 1 DR Cash $400,000
CR Tax anticipation notes $400,000
Dec 31 DR Expenditures - Interest $3,666.67
CR Accrued Interest Payable $3,666.67
Working
February to December = 11 months
Interest = 400,000 * 1.0% * 11/12 months = $3,666.67
April 1 DR Investments $100,000
CR Cash $100,000
Sept. 30 DR Cash $50,200
CR Investments $50,000
Interest Income $200
Working
Interest Income = 50,000 * 0.8% * 6/12 months
= $200
Answer:
d.cost of wages of assembly worker
Explanation:
The following are not related to cost of producing the cell phone because
a.salary of plant supervisor: Overall supervisors are accountable of various product of the organisation for example the plant might have five outputs with the cell phone being one of them therefore his/her labor costs are not related to a certain product.
b.cost of phone components : Direct labor is related to cost of paying workers in an organisation therefore cost of phone components doesn't have anything to do with people.
c.cost of oil lubricants for factory machinery : explanation is the same as in b
d.cost of wages of assembly worker : the worker the directly linked to the production of the product thus his/her wages are a direct labor cost to the manufacturer.
The monthly payment for this car loan is equal to: D. $505. 79.
<u>Given the following data:</u>
To calculate the monthly payment for this car loan:
Mathematically, the monthly payment on a loan is given by this formula:
![M = \frac{P(\frac{r}{12})(1 \;+\; \frac{r}{12})^{12t}}{(1 \;+ \; \frac{r}{12})^{12t} -1}](https://tex.z-dn.net/?f=M%20%3D%20%5Cfrac%7BP%28%5Cfrac%7Br%7D%7B12%7D%29%281%20%5C%3B%2B%5C%3B%20%5Cfrac%7Br%7D%7B12%7D%29%5E%7B12t%7D%7D%7B%281%20%5C%3B%2B%20%5C%3B%20%5Cfrac%7Br%7D%7B12%7D%29%5E%7B12t%7D%20-1%7D)
<u>Where:</u>
- P is the principal or amount borrowed.
- M is the monthly payment.
- t is the number of years.
Substituting the given parameters into the formula, we have;
![M = \frac{23570(\frac{0.1043}{12})(1 \;+\; \frac{0.1043}{12})^{12 \times 5}}{(1 \;+\; \frac{0.1043}{12})^{12 \times 5}\; -\;1}\\\\M = \frac{23570(0.008692)(1 \;+\; 0.008692)^{60}}{(1 \;+\; 0.008692)^{60}\; -\;1}\\\\M = \frac{23570(0.008692)(1.008692)^{60}}{(1.008692)^{60}\; -\;1}\\\\M = \frac{23570(0.008692)(1.6808)}{1.6808\; -\;1}\\\\M = \frac{344.34}{0.6808}](https://tex.z-dn.net/?f=M%20%3D%20%5Cfrac%7B23570%28%5Cfrac%7B0.1043%7D%7B12%7D%29%281%20%5C%3B%2B%5C%3B%20%5Cfrac%7B0.1043%7D%7B12%7D%29%5E%7B12%20%5Ctimes%205%7D%7D%7B%281%20%5C%3B%2B%5C%3B%20%5Cfrac%7B0.1043%7D%7B12%7D%29%5E%7B12%20%5Ctimes%205%7D%5C%3B%20-%5C%3B1%7D%5C%5C%5C%5CM%20%3D%20%5Cfrac%7B23570%280.008692%29%281%20%5C%3B%2B%5C%3B%200.008692%29%5E%7B60%7D%7D%7B%281%20%5C%3B%2B%5C%3B%200.008692%29%5E%7B60%7D%5C%3B%20-%5C%3B1%7D%5C%5C%5C%5CM%20%3D%20%5Cfrac%7B23570%280.008692%29%281.008692%29%5E%7B60%7D%7D%7B%281.008692%29%5E%7B60%7D%5C%3B%20-%5C%3B1%7D%5C%5C%5C%5CM%20%3D%20%5Cfrac%7B23570%280.008692%29%281.6808%29%7D%7B1.6808%5C%3B%20-%5C%3B1%7D%5C%5C%5C%5CM%20%3D%20%5Cfrac%7B344.34%7D%7B0.6808%7D)
Monthly payment, M = $505.79
Read more: brainly.com/question/16992474
Answer:
The correct answer is letter "B": Concurrent engineering.
Explanation:
Compared to the traditional model in which the design is drawn chronologically and methodically, concurrent engineering is a method that allows working in parallel. This model is based on the idea that designers must consider all the stages a product goes through, from the moment when it is an idea until it reaches end-consumers.
This implies the <em>design of the product, its production, quality measurements, market demand, </em>and <em>its positioning among competitors.</em>