1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
o-na [289]
4 years ago
13

When two lines cross, two pairs of vertical angles are formed. What is the sum of all four angles.

Mathematics
2 answers:
Anuta_ua [19.1K]4 years ago
7 0
That would be 360 degrees
telo118 [61]4 years ago
5 0
So the two line is cross, it will form a polygon, a quadrilateral that has 2 pairs of vertical vertices and then formed 4 angles. So it means that the total angle of the polygon is 360 degrees. So base on that the answer would be . 360°

You might be interested in
Marcus is building a fence around his rectangular backyard. The length of his backyard is 75 3/4 ft, and the width is 81 1/4 ft.
Allisa [31]

Answer:

Step-by-step explanation:

Answer:

4,923.75ft²

Step-by-step explanation:

The area of the backyard = Length * width \

Area of the backyard = 75 3/4 * 81 1/4

Area of the backyard = 303/4 * 325/4

Area of the backyard = 6,154.6875ft²

If 3/4 of the fence is finished, the area of the finished part is expressed as;

Finished part = 1/5 * 6,154.6875

Finished part = 1,230.9375ft²

Part left unfinished = 6,154.6875-1,230.9375

Part left unfinished  = 4,923.75ft²

4 0
4 years ago
Read 2 more answers
A welder requires 18 hours to do a job. After the welder and an apprentice work on a job for 6 hours, the welder moves to anothe
Dafna1 [17]

Answer:

the apprentice can complete the job in 30 hours by working alone.

Step-by-step explanation:

Given:

Number of hours required to complete a job by welder = 18 hours

Number of hours welder work on job = 6 hours.

Number of hours required by apprentice to complete the job = 14 hours

We need to find Number of hours required to complete a job by apprentice alone.

Solution:

Let Number of hours required to complete a job by apprentice alone be 'a'.

Also let the job completed be = 1

Now we know that ;

Time required on job is equal to sum of Number of hours welder work on job and Number of hours required by apprentice to complete the job.

framing in equation form we get

Time required on job =  6+14 =20\ hrs

Now we can say that;

each has done a fraction of the work so we will add to two fraction as number of hours of work done by Total number of hours required to do the work to complete 1 job.

so we can frame the equation as;

\frac{6}{18}+\frac{20}{a}=1

By reducing the fraction we get;

\frac{1}{3}+\frac{20}{a}=1

Now we will make the denominator common to solve the fraction we get;

\frac{1\times a}{3\times a}+\frac{20\times3}{a\times3}=1\\\\\frac{a}{3a}+\frac{60}{3a}=1

Now denominators are same so we will solve the numerator we get;

\frac{a+60}{3a}=1

Multiplying both side by 3a we get;

\frac{a+60}{3a}\times3a=1\times 3a\\\\a+60=3a

Combining the like terms we get;

3a-a=60\\\\2a=60

Dividing both side by 2 we get;

\frac{2a}{2}=\frac{60}{2}\\\\a=30\ hrs

Hence the apprentice can complete the job in 30 hours by working alone.

4 0
3 years ago
All the info is in the photos your gonna need the answer to the first photo to answer the second one help plz I'm giving Brainli
navik [9.2K]

Answer:

240 minutes (4 hours)

Step-by-step explanation:

the descend 3000 ft every 20 minutes

36000 ÷ 3000 = 12

20*12 = 240 minutes

7 0
3 years ago
Which square root does the point on the number line BEST represent?
Kisachek [45]
Square root of 3 because it equals 1.73
7 0
3 years ago
Read 2 more answers
if one gallon of paint covers 825 square feet, how much paint is needed to cover 2640 square feet? Make a prediction ​
Nitella [24]

Answer:

3.2 gallons

Step-by-step explanation:

Write a proportion:

1 gallon / 825 square feet = x / 2640 square feet

Solve:

x = 3.2 gallons

7 0
3 years ago
Other questions:
  • a machine takes 4.8 hours to make 8 parts. At that rate, how many parts can the machine make in 24.8 hours?
    13·1 answer
  • 3,817,773 rounded to nearest 100,000
    8·1 answer
  • What is 0.7 in word form
    13·2 answers
  • DEF is A dilatation of ABC by scale factor of 1/3
    14·1 answer
  • Herb has sold 93, 30, 138 and 61 copiers in the last
    12·1 answer
  • Area of the triangle
    11·1 answer
  • What is a definition of a scale on a graph
    9·1 answer
  • For the given central angle, determine the distance traveled along the unit circle from the point (1, 0). 360 degrees a. 6.28 un
    10·1 answer
  • Given RSW ~ TUW. Which proportion is true​
    12·1 answer
  • Beth is going to enclose a rectangular area in back of her house. the house wall will form one of the four sides of the fenced i
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!