For every 1/4 metric ton it takes 1/8 hours
then multipling by 8 to make the hours =1
for every 2 metric tons it take 1 hour
so the quotient is 2 metric tons per 1 hour
Answer:
A.
Step-by-step explanation:
This equation has no solution.
Answer:
So then our significance level is
and we need to remember these two conditions:
1) If the p value
we have enough evidence to reject the null hypothesis at the significance level given
2) If the p value
we have enough evidence to FAIL reject the null hypothesis at the significance level given
And baed on the options we see that the only possibility would be:
d. 0.015
Step-by-step explanation:
We want to know for which value we would REJECT the null hypothesis.
So then our significance level is
and we need to remember these two conditions:
1) If the p value
we have enough evidence to reject the null hypothesis at the significance level given
2) If the p value
we have enough evidence to FAIL reject the null hypothesis at the significance level given
And baed on the options we see that the only possibility would be:
d. 0.015
Answer:
40.96
Step-by-step explanation:
x/10.24=4
times 10.24 on both sides
10.24 times 4
x=40.96