Answer:
3
Step-by-step explanation:
because if you are doing negatives it is kinda like subtracting

Answer:
0.0108 = 1.08% probability that a sophomore non-Chemistry major and then a junior non-Chemistry major are chosen at random.
Step-by-step explanation:
A probability is the number of desired outcomes divided by the number of total outcomes.
Probability that a sophomore non-Chemistry major
Out of 92 students, 9 are non-chemistry major sophomores. So

Then a junior non-Chemistry major are chosen at random.
Now, there are 91 students(1 has been chosen), of which 10 are non-chemistry major juniors. So

What is the probability that a sophomore non-Chemistry major and then a junior non-Chemistry major are chosen at random

0.0108 = 1.08% probability that a sophomore non-Chemistry major and then a junior non-Chemistry major are chosen at random.
The normal distribution is also known as the Gaussian distribution. The percentage of all possible values of the variable that are less than 4 is 15.87%.
<h3>What is a normal distribution?</h3>
The normal distribution, also known as the Gaussian distribution, is a symmetric probability distribution about the mean, indicating that data near the mean occur more frequently than data distant from the mean. The normal distribution will show as a bell curve on a graph.
A.) The percentage of all possible values of the variable that lie between 5 and 9.
P(5<X<9) = P(X<9) - P(5<X)
= P(z<1.5) - P(-0.5<z)
= 0.9332 - 0.3085
= 0.6247
= 62.47%
B.) The percentage of all possible values of the variable that exceed 1.
P(X>1) = 1 - P(X<-2.5)
= 1-0.0062
= 0.9938
= 99.38%
C.) The percentage of all possible values of the variable that are less than 4.
P(X<4) = P(X <4)
= P(z<-1)
= 0.1587
= 15.87%
Learn more about Normal Distribution:
brainly.com/question/15103234
#SPJ1
15 electricians worked for 24 days to the whole job, now, there are 15 of them, so on any given day, each electrician worked one whole day, in 24 days, that one electrician worked 24 days total.
now, there were 15 electricians on any given day though, since each one of them worked the whole day that one day, so the "days work worth" on a day is 15, so the house gets 15days worth of work because of that.
so how many "days worth" did all 15 do on the 24 days, well, 15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15, namely 15 * 24, or 360 days worth of work.
since it takes 360 days worth of work to do the whole wiring, in how many days would 18 electricians do it? 360/18.
Answer:
A and B
Step-by-step explanation:
For A, y=2 is the axis of vertical symmetry, meaning a reflection would map the shape onto itself.
For B, x=3 is the axis of horizontal symmetry, meaning a reflection would map the shape onto itself.
For C, a rotation of 90 degrees would make the shape taller vertically and shorter horizontally, therefore it would be wrong.
For D, a translation two units down would move all points down, even though some would need to go up, therefore it would be wrong.