Answer:
D 20,80 dan/and 120
Step-by-step explanation:
Answer: 132 hours
Step-by-step explanation: First you subtract out the bonus for the month: $2501-$125= 2376 Then divide the $2376 by $18/hour = 132
Answer:
$ 2250
Step-by-step explanation:
3375 = s³
s = ∛3375
s = 15 ft.
floor area = s² = (15 * 15)
floor area = 225 ft²
the contractor charges $10 per ft².
therefore,
the hardwood cost = 225 x $10 = $2250
If B went from (1, 5) to (-3, 2), that means it was shifted down 4 units and left 3 units. So for each of the other points, we subtract 4 from the x value, and subtract 3 from the y value. Point A is (-3, -4), moving this by subtracting 4 from x and 3 from y, we get A'(-7, -7). Point C was (4, 1), subtract 4 and 3, leaving C'(0, -2).
So A'(-3, -4), B'(-3, 2) and C'(0, -2)