<h3>
♫ - - - - - - - - - - - - - - - ~Hello There!~ - - - - - - - - - - - - - - - ♫</h3>
➷ Use the expression "x + 2" to work this out
1 + (1 + 2) + (3 + 2) + (5 + 2) + (7 + 2) + (9 + 2) + (11 + 2 ) + (13 + 2) = 64
He will have saved $64
<h3><u>
✽</u></h3>
➶ Hope This Helps You!
➶ Good Luck (:
➶ Have A Great Day ^-^
↬ ʜᴀɴɴᴀʜ ♡
Unnoticed 507 is:67 is 9$
Rancho middle school has an average of 23 3/8 students per teacher.write this mixed number as a decimal.
Answer:

Step-by-step explanation:
Given:
The given mixed number is 
We need to write the given mixed number as a decimal.
So, we find the decimal number by separating the parts.

The value of 


Therefore, the decimal number of given mixed number is 
Answer:
a. 12 feet b. 12 feet 0.5 inches c. 8.33 %
Step-by-step explanation:
a. How far out horizontally on the ground will it protrude from the building?
Since the rise to run ratio is 1:12 and the building is 12 inches off the ground, let x be the horizontal distance the ramp protrudes.
So, by ratios rise/run = 1/12 = 12/x
1/12 = 12/x
x = 12 × 12
x = 144 inches
Since 12 inches = 1 foot, 144 inches = 144 × 1 inch = 144 × 1 foot/12 inches = 12 feet
b. How long should the ramp be?
The length of the ramp, L is gotten from Pythagoras' theorem since the ramp is a right-angled triangle with sides 12 inches and 144 inches respectively.
So, L = √(12² + 144²)
= √[12² + (12² × 12²)]
= 12√(1 + 144)
= 12√145
= 12 × 12.042
= 144.5 inches
Since 12 inches = 1 foot, 144.5 inches = 144 × 1 inch + 0.5 inches = 144 × 1 foot/12 inches + 0.5 inches = 12 feet 0.5 inches
c. What percent grade is the ramp?
The percentage grade of the ramp = rise/run × 100 %
= 12 inches/144 inches × 100 %
= 1/12 × 100 %
= 0.0833 × 100 %
= 8.33 %
If you calculate SLE to be $25,000 and that there will be one occurrence every four years (ARO), then the ALE is $40,000.
<h3>What is Single-loss expectancy (SLE)?</h3>
A expected monetary decline each moment an asset is at risk is referred to as single-loss expectancy (SLE). It is a term that is most frequently used during risk analysis and attempts to assign a monetary value to each individual threat.
Quantitative risk analysis predicts the likelihood of certain risk outcomes as well as their approximate monetary cost using relevant, verifiable data.
IT professionals must consider a wide range of risks, including the following:
- Errors caused by humans
- Cyber attacks, unauthorised data disclosure, or data misuse are examples of hostile action.
- Errors in application
- System or network failures
- Physical harm caused by fire, natural disasters, or vandalism.
To know more about the Single-loss expectancy (SLE), here
brainly.com/question/14587600
#SPJ4