Answer:
The probability that between 79% and 81%of the 500 sampled wildlife watchers actively observed mammals in 2011 is P=0.412.
Step-by-step explanation:
We know the population proportion π=0.8, according to the 2011 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation.
If we take a sample from this population, and assuming the proportion is correct, it is expected that the sample's proportion to be equal to the population's proportion.
The standard deviation of the sample is equal to:

With the mean and the standard deviaion of the sample, we can calculate the z-value for 0.79 and 0.81:

Then, the probability that between 79% and 81%of the 500 sampled wildlife watchers actively observed mammals in 2011 is:

Answer:
A
Step-by-step explanation:
The equation of a line passing through the origin is
y = mx ( m is the slope )
To find m use the slope formula
m = ( y₂ - y₁ ) / ( x₂ - x₁ )
with (x₁, y₁ ) = (1, 1) and (x₂, y₂ ) = (- 1, - 1) ← 2 points on the line
m =
=
= 1
y = x ← is the equation of the line → A
Answer:
because your just adding a zero at the end.
Step-by-step explanation:
Answer:
False
Step-by-step explanation:
If you were to divide a negative number by a negative number, or multiply a negative number by a negative number, you would change the sign to positive as two negatives make a positive.