Answer:
See explanation
Step-by-step explanation:
1. 15x+3m. 15 represents the fee per ride, x, and 3 gets added to the total cost depending on how many miles, m, you go.
Everytime you see per, that usually means "some value times a variable"
2. 17 miles would cost 66. 15(1)+3(17)= 15+ 51= 66.
3. 10 miles, because 15(1 ride)+3(10 miles)= 45 dollars.
I tried
the answer is 8 G(×) =0 interpret something like that but yeah
Answer:
That would be (2,3)
Step-by-step explanation:
When we're moving left in the coordinate plane, we are subtracting the x-coordinate by how much distance we move.
In this case, 7-5=2, so the new x-coordinate is 2, but the y-coordinate doesn't change since we're going horizontally and not vertically.
Answer:
<em>y = 255x + 6559</em>
Step-by-step explanation:
<u>Function Modeling</u>
We have the following relationship between the minutes into the ride (x) and the elevation of the tram (y):
x={2,5,9,14}
y={7069,7834,8854,10129}
We first test if the relationship is linear or not.
A linear relationship is tested by calculating the slope from any pair of points.
Suppose we know the line passes through points A(x1,y1) and B(x2,y2). The slope can be calculated with the equation:

Selecting the first two points (2,7069) and (5,7834)

m = 255
Selecting the first two points (5,7834) and (9,8854)

m=255
If we repeat the calculation with any pair of points, we get the same value for the slope, thus we can conclude the relationship is linear.
Using the point-slope form of the line:
y - k = m( x - h )
We select the point (2,7069)
y - 7069 = 255( x- 2 )
Operating:
y - 7069 = 255x - 510
Adding 7069:
y = 255x - 510 + 7069
y = 255x + 6559