1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Inessa [10]
3 years ago
9

What is the value of fraction 1 over 3x2 + 5.2y when x = 3 and y = 2?

Mathematics
2 answers:
LenaWriter [7]3 years ago
4 0
\dfrac{1}{3}x^2+5.2y\\\\for\ x=3\ and\ y=2\\\\\dfrac{1}{3}\cdot3^2+5.2\cdot2=\dfrac{1}{3}\cdot9+10.4=\dfrac{9}{3}+10.4=3+10.4=13.4
GrogVix [38]3 years ago
3 0

Answer:

B. 13.4

Step-by-step explanation:

We have the fraction, L=\frac{1}{3}x^2+5.2y.

It is required to find the value of the fraction when x = 3 and y = 2.

So, on substituting these values, we get,

L=\frac{1}{3}(3)^2+5.2\times 2

i.e. L=\frac{9}{3}+10.4

i.e. L=3+10.4

i.e. L=13.4

So, the value of the fraction is 13.4

Hence, option B is correct.

You might be interested in
3x²-4x+7 how do I find the domain?
Eddi Din [679]
The domain of this equation is the lowest x value to the highest x value. For example: lowest is -4 and highest is 3. You would write it as [-4,3]

For this equation, the domain is (-infinity,infinity) because there is no lowest or highest x value.
8 0
3 years ago
a geometric sequence has an initial value of 25 and a common ratio of 1.8. Write a function to represent this sequence . Find.th
Debora [2.8K]
Use the formula

a_n = a_1•r^(n-1)

a_23 = 25•(1.8)^(23 - 1)

Can you finish?
8 0
3 years ago
Evaluate the expression 4^3÷(7-3) × 2 PLEASE HURRY AND HELP ME I DONT HAVE MUCH TIME TILL ITS DUE ​
docker41 [41]

Answer:

The answer is 32.

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
200 labourers need 50 days to construct a road of 4 km long. How many labourers are needed to construct 8 km long in 80 days​
patriot [66]

Answer:

250

Step-by-step explanation:

Number of labourers * Number of days worked = Total number of working days

Total number of working days to construct a 4km long road: 200*50=10000

Total mumber of working days to construct a 8km long road: 10000*2=20000

Labourers: 20000 ÷ 80 = 250.

250 labourers are required.

7 0
3 years ago
MIDDLE SCHOOL MATH BRAINLEIST AND 5 STARS AS SOON AS YOU ANSWER!!!!!!!! PLEASE HELP AND THANKS SO MUCH IM SUPER GRATEFUL!!!!!!!!
gladu [14]

Answer:

Bottom prism: 126*11=1386    

Top Prism: 2*45=90

Total volume: 1386+90= 1746 cubic cm

4 0
3 years ago
Read 2 more answers
Other questions:
  • Given a mean of 8 and a standard deviation of 0.7, within how many standard deviations of the mean do the values 7.7, 8.4, 9, 8,
    12·1 answer
  • A 10-foot ladder is to be placed against the side of a building. The base of the ladder must be placed at an angle of 72 degrees
    9·1 answer
  • Let f(x) = 3x + 2. If f(x) = 11, find x.
    11·1 answer
  • Solve the inequality.<br><br> 14c&lt;8
    9·1 answer
  • A graduated cylinder is filled with 36 cm 3 of liquid the liquid is poured into a different cylinder that has a radius of 3cm ,
    5·1 answer
  • Help me simplify this
    11·2 answers
  • What is 6.02 x 10^-4
    11·2 answers
  • A garage sells cars.
    15·1 answer
  • What is meant by a stratified sample?
    13·2 answers
  • Help could you explain step by step?
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!