Answer:
3,27
Step-by-step explanation:
Answer:
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated?
This is 1 subtracted by the pvalue of Z when X = 16. So



has a pvalue of 0.9082
1 - 0.9082 = 0.0918
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Answer:
m = (-3, 2) x = (-1)
Step-by-step explanation:
Just took this K12 test.
Answer:
A
Step-by-step explanation:
Since the total cost at first will not be 5 exactly, it will turn to 4.5 (4.50). And it will be just below the five, at the first hour. And then from there, just add 3.25 each hour and forget about the 1.25 since 1.25 is used for the beginning only, and not the rest.
-By Shamaria Vaughn.
Answer: y = 3/4x
Step-by-step explanation:
Each y-value output is 3/4 of the x-value inputted.
8 x 0.75 = 6
12 x 0.75 = 9