Answer:
21 bows per hour
Step-by-step explanation:
when your trying to find the perfect hour you divide.
so 756÷36=21
hope this helps
ANSWER: 60% of the members are males
How?
-800 total
-320 females
800 - 320 = 480
480/800 = 0.6
Hope this Helps!
Answer:
option D.
Step-by-step explanation:
average rate of change in steel production over the eight days=-0.15 tons per day
Step-by-step explanation:
The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons.
Production is dropped by 1.2 tons, so its negative
Average rate of change = Change in production / number of days
Average rate of change = -1.2/ 8= -0.15
so sorry -0.15
Answer:
The value of the test statistic is of 0.22.
Step-by-step explanation:
Our test statistic is:

In which X is the sample mean,
is the expected mean,
is the standard deviation(square root of the variance) and n is the size of the sample.
A lumber company is making boards that are 2920.0 millimeters tall.
This means that
.
A sample of 12 is made, and it is found that they have a mean of 2922.7 millimeters with a variance of 121.00.
This means that
. So



The value of the test statistic is of 0.22.