It is both true that <span>Technician A says that the excessive length of a heater hose is intended to protect the heater core from undue stress. Technician B says that excessive wear adds to the length of a heater hose, and a replacement heater hose should be roughly three to four inches shorter than its predecessor.  So the asnwer is letter B.</span>
        
             
        
        
        
<span>Stock market firms, also known as brokerage firms, assist in the act of buying and selling financial securities. These trades are financed through financial institutions for security.</span>
        
             
        
        
        
I want to delete my account as i do 
that is what google translate says<span />
        
             
        
        
        
The engineering design process important to the customer layout system permits things: A shared technique on a way to discover and remedy problems. A framework to assess ideas, tell priorities and save you myopic paintings.
<h3>What is the maximum vital step withinside the engineering layout system?</h3>
The first step withinside the engineering layout system is to outline the trouble that you are solving. This step is the maximum vital, as a defective know-how of the trouble handy ends in layout failures. Engineers paintings to discover the foundation trouble via way of means of opposite engineering the signs and symptoms they perceive.
The engineering layout system, via way of means of definition, is a sequence of steps that engineers use to discover an option to a trouble. These steps include: defining the trouble, brainstorming solutions, designing and constructing a prototype of the solution, trying out the solution, and enhancing it.
Read more bout the engineering :
brainly.com/question/17169621
#SPJ1