1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
labwork [276]
4 years ago
14

Shawn and Ellie are construction workers. Shawn can complete a concrete job in 5 hours, while Ellie can complete it in 7 hours.

The foreman says that it will take them 6 hours to complete it if they work together, explaining you just add the hours for each worker and divide by 2. Explain each step in solving this equation, and determine if the foreman is correct or not.
Mathematics
1 answer:
eimsori [14]4 years ago
4 0

Step-by-step explanation:

We generally assume that when multiple resources are put on a job, the completion rate is the sum of the completion rates of the different resources. Rate is generally measured in units per time. Here, the appropriate "unit" is "job".

Step 1 is convert the hours per job to a rate in terms of jobs per hour.

... Shawn can complete 1/5 job per hour.

... Ellie can complete 1/7 job per hour.

Step 2 is to add the rates to get the total rate when both resources are applied.

... (1/5 job/h) + (1/7 job/h) = (7/35 +5/35) job/h = 12/35 job/h

Step 3 is to convert that rate back to the time require to complete one job. We can divide the work to be done (1 job) by the rate at which it is done in order to find the time required.

... (1 job)/(12/35 job/h) = 35/12 h = 2 11/12 hours = 2 hours 55 minutes

The foreman is incorrect.

_____

<em>Comment on the solution</em>

The time when workers work together will always be between the longest time divided by the number of workers (7/2 = 3.5 hours here) and the shortest time divided by the number of workers (5/2 = 2.5 hours here). Our answer of 2.92 hours is in that range.

The foreman should know better. (If s/he were to divide the average completion time (6 h) by the number of workers (2), s/he would have a guess of 3 hours—closer, but still incorrect.)

You might be interested in
2y = 1.2x + 1 the x from 1 to 3 i need to create a table
Goshia [24]
Y = 0.6x + 0.5 will be standard form. When x = 1, Y = 1.1. X=2, Y=1.7. X=3, Y=2.3.
4 0
3 years ago
Find the equation of the line through M parallel to 3x+y=18
love history [14]

Answer:

3x+y=18

3xy=18

xy= 18/3

xy=6

5 0
3 years ago
Read 2 more answers
In the figure, a || e, m || n , and m&lt;1 = 108°
antoniya [11.8K]

Answer:

108°

Step-by-step explanation:

Angle 1 = Angle 2

Vertically opposite angles

Angle 2 = Angle 3 = 108

Corresponding angles

6 0
3 years ago
819÷17=?<br> Write your answer as a whole number and remainder.
8090 [49]
Your answer would be 48 3/17
8 0
3 years ago
How do i solve 6x+2y= 8
Aleksandr [31]

Answer:

The correct answer is,

for X:

x =  \frac{4 - y}{3}

for y:

y =   4 - 3x

4 0
3 years ago
Other questions:
  • What us the answer to the equation 6r-1-6r=11
    14·1 answer
  • Which situation most directly illustrates a possible outcome of a fiscal policy?
    15·1 answer
  • What is the result when the number 92 is decreased by 50%?
    13·1 answer
  • What is 37.5% of 360?
    12·2 answers
  • A baby otter was born 3/4 of a month early. At birth it's weight was 7/8 kilograms which is 9/10 kilogram less than the average
    11·2 answers
  • Which of the following lines is perpendicular to y=-2x+3?
    6·1 answer
  • A $50 item is discounted 30%. How much is the discount?​
    10·2 answers
  • Find the area of the regular hexagon if the radius of a circle inscribed in the hexagon is 10√3
    7·1 answer
  • Becky has sold 22 candy bars for a fundraiser. Her goal is to sell a total of 45 candy bars. How many more cany bars does Becky
    12·2 answers
  • Tony has a narrow piece of wood that is 40 inches long. He wants to make a frame for a picture. He wants to top and bottom to be
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!