Answer:
1065
Step-by-step explanation:
57-42×-3-21
Answer:
93
Step-by-step explanation:
the total of all those are 150 so if you multiply it by three you get 450
so multiply pizza by three too
to get 93
Answer:
Step-by-step explanation:
In costing analysis, direct materials, labour and direct expenses aggregate to prime cost. Alternately, the aggregate of indirect materials, labour and expenses is termed as overhead. Overheads are classified into fixed and variable.
Variable overhead is one which varies directly as per number of units produced
Variable overhead rate variance = actual costs -(AHxSR)
= Actual costs - (Actual hours x std rate)
= Actual hours x actual rate - actual hours x std rate
Hence option D is right.
Answer:
Option A.
Step-by-step explanation:
The given matrix is
We need to find the system of equations which is represented by the matrix.
In the given matrix first row represents the first equation and second row represents the second equation of the system of equations.
Let two variables are x and y.
First column represents the coefficients of x and second column represents the coefficients of y.
Numbers on the right side of the matrix represents the numbers which are right side of the equations.
Now, the required equations are
Therefore, the correct option is A.