Answer:
part 1) BC is 17491 ft
part 2) CD is 6499 ft
Step-by-step explanation:
You would cross multiply for this.
20 ·
35 = 700
Then you would divide.
700 ÷
50 = 14
There would be
14 cones placed along 35 feet of road.
Answer:
The 95% confidence interval for the average hourly wage of all information system managers is (39.14,42.36)
Step-by-step explanation:
In order to calculate the 95% confidence interval for the average hourly wage we would have to calculate first the margin of error as follows:
ME=t0.05/2,n-1s/√n
for n=75, t0.025,74=1.993
Therefore, ME=1.993*7/√75
ME=1.61
Therefore, the 95% confidence interval for the average hourly income of all syatem manager would be as follows:
(X-ME,X+ME)=(40.75-1.61,40.75+1.61)
=(39.14,42.36)
Answer: -2
Step-by-step explanation:
so to find the slope of the two points you can use this equation:
and just plug and chug!
Let's use a rule of three:
Therefore,

We would neeed 7978.67 lb of blue grass seed.