Pre-Columbian' is a term used to describe the people, history, and cultures of the Americas before Columbus arrived in 1492.
Question options:
Waterfall
Parallel
Iterative
System prototyping
Throwaway prototyping
Answer:
Waterfall
Explanation:
Waterfall is a project management approach and methodology often applied to engineering areas and software development where a project is completed step by step in linear fashion such that every step depends on the previous one and moves from there. There are distinct stages under this approach and straightforwardness, project flows in one direction(like a waterfall). There is also a greater level of specialization as the plan is made upfront and it proceeds with hardly any changes in the plan.
b.
prices in 2012 are higher than prices in the base year
• Limitations on the power of government and the protection of the political rights of individuals are
important ideals of Americans.
• The ideals of a nation are reflected in their important documents.
Answer:
The correct answer is Inspection of products produced to ensure that the products meets customer specifications.
Explanation:
To be considered as such, a value-added activity must meet all three of the following criteria:
a) The customer is willing to pay for this activity to be done
b) The action must be done right the very first time
c) The activity transforms somehow the product or service
The correct answer meets the three criteria, since the user is willing to pay to make sure that the product meets his standards, it is done right the first time and transforms the product, since it adds a type of quality control and certification.