Answer: Option (A) is correct.
Explanation:
An event planner or meeting planner is an individual who is responsible for bringing together every individual implicated in producing a get-together, incentive, special event. This individual understands the intent of the task, or organization's rationale. This requires working with a diverse range of people within the organization, also resources that are considered as external.
Answer:
the increased in the labor productivity is 23.08%
Explanation:
The computation of the increased in the labor productivity is given below;
= (Increase in production - current production) ÷ current production
= (1,920 valves - 1,560 valves) ÷ 1,560 valves
= 23.08%
hence, the increased in the labor productivity is 23.08%
Therefore the same should be considered
Answer:
1805
Explanation:
Number of units sold in September = 160 units
Using the first - In, First out inventory method : assumes that the oldest (first) inventory items have been sold first.
Inventory items will first be sold from April, the May and so on :
Unit price in April = $11 ; Number of items = 115
($11 * 115) = $1265
(160 - 115) = 45 units
This 45 units will be sold at unit price for May :
(45 * $12) = $540
Cost of goods sold in September :
$1265 + $540 = $1805
Answer:
1. The increase in savings resulting directly from this change in income is $500
That is
Increase in savings = Increase in income minus increase in consumption
= 2000 - 1500
= $ 500
2.The marginal propensity to save (MPS) is calculated by dividing the change in savings by the change in income.
That is
ΔS/ ΔY,
Therefore given
Change in savings =ΔS =$500
Change in income =ΔY = $2000
MPS = 500/2000
MPS = 0.25
3.The marginal propensity to consume (MPC) is calculated by dividing change in consumption by changes in come.
That is ΔC / ΔY
Where ΔC = 1500
ΔY = 2000
Therefore MPC = 1500/2000
= 0.75
1. The increase in savings resulting directly from this change in income is $
Answer:
Legacy System.
Explanation:
Legacy system is a current or existing system that will become the base for upgrading or integrating with a new system. Legacy system is computing software which is mostly outdated but it is still in use.