A construction crew must build 3 miles of road. On tuesday, they build 1/4 mile of road. How many miles of road do they still ha
ve to build this week
1 answer:
Answer:
2.25 miles of road they have to build this week
Step-by-step explanation:
Given:
Total distance of the road = 3 miles
Distance constructed on Tuesday = 1/4 mile of road.
To Find:
Miles of road still have to be built this week=?
Solution:
Let the Distance that have to be built be X
Then,
X= total distance of the Road – the distance built on Tuesday
X = 3 – 
X = 3 - 
X =
X= 
X= 2.25 miles
You might be interested in
Since A is the midpoint of BC, we can assume BA and AC are equal to each other.
We also know that BC = BA + AC = 23 + 23 = 46
Answer:
Step-by-step explanation:
Given that,
the rectangular prism has ;
- length=8meters
- width=6meters
- height=3meters
<u>As</u><u> </u><u>we</u><u> </u><u>know</u><u>,</u><u> </u>
- volume =length×width×height
- V=8×6×3
Step-by-step explanation:
Total surface area of cuboid= 2(lb+bh+hl)
= 298ft²=2(28+4x+7x)
= 149=28+11x
= 121=11x
= 11=x
Answer: 85
Add up all the numbers: 97+70+89+99+100+78+79+89+77+72=850
Divide 850 by the amount of numbers:
850/10=85
I hope this helps and good luck! :)