The line is parallel to y axis
We know that if a line is parallel to y axis
So there is no slope
Here it has constant x value as -2
So the equation is
Option A
Answer: (60.858, 69.142)
Step-by-step explanation:
The formula to find the confidence interval for mean :
, where
is the sample mean ,
is the population standard deviation , n is the sample size and
is the two-tailed test value for z.
Let x represents the time taken to mail products for all orders received at the office of this company.
As per given , we have
Confidence level : 95%
n= 62
sample mean :
hours
Population standard deviation :
hours
z-value for 93% confidence interval:
[using z-value table]
Now, 93% confidence the mean time taken to mail products for all orders received at the office of this company :-

Thus , 93% confidence the mean time taken to mail products for all orders received at the office of this company : (60.858, 69.142)
Okay, so all the angles of the triangle will add up to 180
You know one side is 104 and the other two are equal to each other.
180-104= 76
76 is both of the angles together so divide it by two to get 38
X=38
:)
Answer:
D. (25π - 50) sq m
Step-by-step explanation:
Since ABCD is a square with the area of 100, we know that the dimensions are 10 by 10. With that, we can find that triangle ABC = 50 sq m because of (h*l)/2. Since A is the center of the circle that contains arc BD, we know that 10 is the radius of the quarter-circle ABC. Using (πr^2)/4 to get the area of the quarter-circle, we get that the quarter-circle ABC = 25π sq m. But the original triangle ABC in the quarter-circle is not shaded. Therefore, we subtract 50 from 25π, which leads to (25π - 50) sq m.
I hope this helped! :D