Answer:
Option d pretest
Explanation:
Given the pseudocode:
- do stepA
- do stepB
- if conditionC is true
- then do stepD
- else
- do stepE
- end if
- while conditionF is true
- do stepG
- end while
The pseudocode above shows that there is a pretest before some codes are executed. For example, line 3 check if condition is true then only execute stepD otherwise execute stepE. Line 8 check if conditionF is true then repeatedly execute stepG. These are examples of pretest a condition will must be met (pretest passed) before a block of codes can be executed. This pretest can be seen in if-else statements and also the while condition.
The kind of wire and circuit breaker are: grounding wire such as fairly large bare copper wire.
<h3>What is the best wire for the above?</h3>
A 20A, 120V small-appliance branch circuit is known to be used in the case above.
Note that Electric range circuits needs about 50-amp, 240-volt made for circuit that is said to supplies the power to the range or oven via a 6-3 electrical wire.
Learn more about circuit breaker from
brainly.com/question/8976395
#SPJ1
Answer:
the bottom third
Explanation:
Check out the exampe below.
swim() would be an example of a method.
Answer:
Device Health Attestation Services
Explanation:
Based on the scenario being described it can be said that the Windows Server role that can be used to automate this check is known as Device Health Attestation Services. This is a role that allows the administrator to automatically check if a device has the required trustworthy BIOS, TPM, or boot software enabled, as well as Bitlocker encryption.