Answer:
Largest prime factor of the given expression is <em>379.</em>
Step-by-step explanation:
Given the expression:

To find:
The largest prime factor of the given expression.
Solution:
First of all, let us factorize the given expression.

Let us learn two formula:


Applying the above formula in the expression written above:
...... (1)
Similarly:
........ (2)
Multiplying the expressions from (1) and (2) to get the result:

So, largest prime factor of the given expression is <em>379.</em>
The answer is m to the power of 8. Just add exponents with the same base.
Answer:
Lower left.
Step-by-step explanation:
To determine if a graph is a function the "vertical line test is used. If any point on a graph has one x value go to two y values it is not a function.
Witht he four pictures, the two on the right use a horizontal line, so it doesn't tell at all, on the leftthe upper one is vertical but it doesn't show that one x value has two corresponding y values. So it must be the lower left one.
The lower left picture has a line at x=1, and it passes through the line of the graph at two different y values, 4 and -4. So this has two y values with one x value.
Answer:
1) 
2) 
Step-by-step explanation:
Given:
IAI = 8.00 units directed at angle of 45.0 degrees with +x - axis
IBI = 8.00 units directed along -x - axis.
Components of vector along x and y directions:



1) To find Vector sum 

2) To find Vector sum 

Answer: The company can build 10 child bikes and 12 adult bikes in the week .
Step-by-step explanation:
Let 'c' be the number of child bike and 'a' be the number of adult bike.
According to the problem
The restriction of building time for a week is 4c+6a≤120 hours.........(1)
and the restriction of testing time for a week is 4c+4a≤100 hours...............(2)
Lets check whether company can build c=10 and a=12 bikes in a week by putting this value in (1) and (2)
(1)......4(10)+6(12)=40+72=112≤120 ⇒Restriction of building time is satisfied.
(2)......4(10)+4(12)=40+48=88≤100⇒Restriction of testing time is satisfied.
Hence, the company can build 10 child bikes and 12 adult bikes in the week,as order is meeting with the restrictions.