1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
inn [45]
3 years ago
10

What number has the prime factorazation3x3x5x5x11?

Mathematics
1 answer:
bazaltina [42]3 years ago
7 0
You got these prime numbers from a factor tree you need to multiple them together to get 2475
You might be interested in
Which of the following grids correctly graphs the points A (3, 1), B (0, 3), and C (1, 3)? A. A coordinate plane has an x-axis f
cricket20 [7]

Answer:

Step-by-step explanation:

B. A coordinate plane has an x axis from 0 to 5 in increments of 1 and a y axis from 0 to 5 in increments of 1. Point A (3,1) is plotted 3 units to the right and 1 unit above the origin. Point B (0,3) is plotted 3 units above the origin. Point C (1,3) is plotted 1 unit to the right and 3 units above the origin.

7 0
3 years ago
I wanna know: [3,5]={3,4,5}? Why?
Agata [3.3K]

Answer:

Yes if [3,5] is a set of integers then it contains elements 3,4,5

As Closed bracket denotes that extreme points are also included and 4 is mid element in between 3 and 5

6 0
2 years ago
-5x+2y=4 solved algebraically
yan [13]
-5x + 2y - 4 = 0

= 5x - 2y + 4 = 0
5 0
3 years ago
2. Triangle ABC and triangle EFD ARE ?PLEASE HELP
ad-work [718]

Answer:

similar SAS

Step-by-step explanation:

because the angle c has the angle c and sides are cb,ba .

because the angle d has the angle d and slide are df, Fe

3 0
3 years ago
EM Company produces two types of laptop computer bags. The regular version requires $32 in capital and 4 hours of labor and sell
expeople1 [14]

Answer:

Step-by-step explanation:

Given that EM company produces two types of laptop computer bags.

Let regular version produced be R and deluxe version be D

Total capital required

= 32R+38D\leq 2100

Total labor hours required

=4R+6D\leq 280

Sales revenue = 46R+55D

Solving the two constraints we have

10D \leq 140

D can be atmost 14 and hence R can be 49

Otherwise if D is made 0, R = 65 maximum

If R is made 0, D maximum is 46

Thus corner points are (65,0) (0.,46) or (49,14)

Sales revenue for (65,0) = 2990

(0,46) is 2530

(49,14) is 3024

Maximum when R =14 and D is 49

5 0
3 years ago
Other questions:
  • How to simplify 1/2/1/8
    8·1 answer
  • Is meter longer than centimeters
    9·2 answers
  • What is the value of d + e + f when d = 20, e = –4 and f = –2?
    13·1 answer
  • Cindy’s parking garage charges $3.50 for weekday parking, and weekends are half price. If Cindy parked in the garage 20 times pe
    7·1 answer
  • I need to Simplify (3mn)^4
    13·1 answer
  • Refer to the graph What conclusion can you make about the relationship between the number of items sold i and the
    6·1 answer
  • Please help with this ! No need for work- its oka :D
    9·1 answer
  • A line contains the points (-4,1) and (4,6). Decide whether or not each point of these points is also on the line.
    9·2 answers
  • Answer as much as youd like, and pls pls pls dont take my points I actually need help
    5·2 answers
  • + 2 1/4 cups
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!