Answer:
(24, 224 ) i.e. 24 basketball and 224 footballs
Step-by-step explanation:
<em>Basketball :</em>
uses 4 ounces of foam
20 minutes of labor
profit = $2.50
<em>Football :</em>
uses 3 ounces of foam
30 minutes of labor
profit = $2
Manufacturer has :
768 ounces of foam , 120 labor hours per week,
<u>using the simplex method to determine the optimal production schedule so as to maximize profits </u>
lets assume
x = number of basketball
y = number of footballs
maximize = 2.5 x + 2y from a linear programming problem
attached below is the detailed solution
Answer:
White
Step-by-step explanation:
20 divided by 4 = 5
White was spun 5 times.
$1.08
you would multiply your cost (1.00) by 8% which is equivalent to .08 and then add to to the original cost. or to skip the middle step just multiply it by 1.08 since you are adding the 8% to 100% of the original cost
When two linear equations have only one solution the two lines on a graph would intersect each other ( they would only touch in one spot).
Current (A)
Q=It
where Q is electric charge, I is current and t is time