Answer: option d. C (0,3), D (0,5).
Justification:
1) The x - coordinates of the vertices A and B are shown in the diagrama, They are both - 4, so the new vertices C and D must be in a line parallel to y = - 4.
2) The y-coordinates of the vertices A and B are also shown in the diagrama. They are equal to 3 and 5 respectively.
3) We can see that the new points C and D must be over a parallel line to y = - 4 and that their distance to the points A and B has to be the same distance of the point R and S to U and T.
That distance is 4, so the line may be y = - 7 or y = 0.
4) If the line is y = 7 the points C and D would have coordinates (-7,3) and (-7,5), but this points are not among the options.
5) If the line is y = 0 the points C and D would have coordinates (0, 3) and (0,5), which is precisely the points of the option d. That is the answer.
Answer:D
Step-by-step explanation:
Answer:
The 95% confidence interval for the average monthly electricity consumed units is between 47.07 and 733.87
Step-by-step explanation:
We have the standard deviation for the sample. So we use the t-distribution to solve this question.
The first step to solve this problem is finding how many degrees of freedom, we have. This is the sample size subtracted by 1. So
df = 45 - 1 = 44
95% confidence interval
Now, we have to find a value of T, which is found looking at the t table, with 44 degrees of freedom(y-axis) and a confidence level of
. So we have T = 2.0141
The margin of error is:
M = T*s = 2.0141*170.5 = 343.4
In which s is the standard deviation of the sample.
The lower end of the interval is the sample mean subtracted by M. So it is 390.47 - 343.40 = 47.07 units per month
The upper end of the interval is the sample mean added to M. So it is 390.47 + 343.40 = 733.87 units per month
The 95% confidence interval for the average monthly electricity consumed units is between 47.07 and 733.87
Yes the ratio would change because it needs 3 times more than the original amount so you would multiply it by 3