Answer:
$33,700 (Favorable)
Explanation:
Note: Figures are not inputted. The missing figures have been figured out as below.
"<em>Nexus industries uses a standard costing system to apply manufacturing costs to its production process. In May nexus anticipated 2700 units with fixed manufacturing overhead costs allocated at $8.40 per direct labor hour with a standard of 2.5 direct labor hours per unit. In May, actual production was 3400 units and actual fixed manufacturing overhead cost were $23000. What was nexus fixed manufacturing overhead volume variance in May</em>?"
Solution:
Budgeted fixed overhead costs = Units * Direct labor cost * Standard Direct Labor hours per unit
= 2,700 units * $8.40 * 2.5
= 2,700 units * 21
= $56,700
Fixed manufacturing overhead volume variance = Actual fixed overhead cost - Budgeted fixed manufacturing overhead costs
When Actual fixed overhead = $23,000
, Budgeted fixed overhead costs = $56,700
Fixed manufacturing overhead volume variance = $23,000 - $56,700
= $33,700 (Favorable)
.
Answer:
Price floor binding
b. price ceiling binding
price floor and binding
Explanation:
A price floor is when the government or an agency of the government sets the minimum price of a product. A price floor is binding if it is set above equilibrium price.
Price ceiling is when the government or an agency of the government sets the maximum price for a product. It is binding when it is set below equilibrium price.
The minimum price of milk is above equilibrium price. So, it is a binding price floor
The maximum price of milk is below equilibrium price. It is binding price ceiling
If teenagers can't find jobs due to minimum wages law. It means that the minimum wage must be above equilibrium price. This is because it is when price is above equilibrium price that supply of labour outstrips demand. So, it is a binding price floor
Answer:
Paticipative budgets
Explanation:
A budget can be defined as a financial plan which gives an estimate of income and expenditures. A budget is a tool that is utilized by different organisations to manage their resources inorder to achieve their various objectives and goals.
A budget shows the different costs incurred by the organisation within a particular period of time.
Participative budgets is a type of budget in which the low level management of an organization are involved in the preparation of budget. It helps to prevent top managers from unruly behaviours.
Participative budget enables the top level and low level managers to share information that will lead to the growth of the organisation.
It’s money I’m pretty sure
Jdhdhdhdjsuushdbdbdbudufjrjifufjfjfkfkfkididududjejdjdjfkkfjfjrufifiir