Answer:
4.5 miles per hour
Step-by-step explanation:
Answer:
a. 3/4 inches per minute
b. -1 1/8 inches per minute
c. B is fastest; 1 1/8 is more than 3/4
Step-by-step explanation:
A <em>change</em> is a <em>difference</em>. A <em>rate of change</em> is <em>one difference divided by another</em>, usually the change in y-value divided by the change in x-value.
__
<h3>a.</h3>
The change in elevation is the difference between the elevation at the end of the period (6 inches) and the elevation at the beginning of the period (3 inches). The change in time period is the difference between the end time (8 min) and the beginning time (4 min).
change in elevation per minute = (6 -3 inches)/(8 -4 min)
= (3 inches)/(4 min) = 3/4 inches/minute
__
<h3>b.</h3>
Similarly, ...
change in elevation per minute = (3 -7 1/2 inches)/(18 -14 min)
= (-4 1/2 inches)/(4 min) = -1 1/8 inches/minute
__
<h3>c.</h3>
We know that 3/4 is more than -1 1/8, but when we talk about the "fastest rate of change", we're generally interested in the magnitude--the value without the sign. That means we understand a rate of change of -1 1/8 inches per minute to be "faster" than a rate of change of 3/4 inches per minute.
The rate of change from Part B is fastest. 1 1/8 inches per minute is more than 3/4 inches per minute.
Answer:
Step-by-step explanation:
Alright, lets get started.
The two chords are intersection each other at point B.

Both are opposite angles that is 39 degrees.
Angle ABC forms the arc AC which is given 41 degree.
The arc DE will be same length as arc AC because angle ABC and angle DBE are same that is 39 degrees.
So, arc DE = 41
So, the answer is DE = 41 degrees .... Answer : option D
Hope it will help :)
Step-by-step explanation:
Distribute:
=−x2+−4x+−4+7
Combine Like Terms:
=−x2+−4x+−4+7
=(−x2)+(−4x)+(−4+7)
=−x2+−4x+3
Answer:
=−x2−4x+3