Answer:
b. $750 per direct labor
Explanation:
Calculation for the what was the predetermined overhead rate
Using this formula
Predetermined overhead rate=Factory overhead / Direct labor hours
Let plug in the formula
Predetermined overhead rate=$1,500,000/$200,000 hours
Predetermined overhead rate= 7.5*100
Predetermined overhead rate=$750 per direct labor
Therefore the predetermined overhead rate will be $750 per direct labor
Answer:
$13,130.4
Explanation:
Mean is a measure of average. It is used to calculate the average of a given set of data.
Mean = Sum of Terms/Number of Terms
Monthly Mean Rental Cost = Total rental cost / Number of rents
= ($6,350 + $5,745 + $11,870 + $15,255, + $26,432)/5
= $65652/5
=$13,130.4
Answer:
How to prioritize your tasks (and your time)
Capture everything on a Master List and then break it down by monthly, weekly, and daily goals.
Separate the urgent from the important tasks with the Eisenhower Matrix.
Rank your daily tasks by their true priority with the Ivy Lee Method.
Adam Smith, and Invisible hand. hope this helps!