Answer:
$7.78
Explanation:
Calculation to determine what is General Industriesʹ expected current share price
First step is to calculate the FCF6
FCF6 = $32 million × (1 + 0.05)
FCF6= $33.6 million
Second step is to calculate the V5
V5 = $33.6 million / (0.09 - 0.05)
V5= $840 million
Third step is to calculate V0 using financial calculator
V0 = 652.45 million
Now let calculate expected current share price
P0 = $(652.45 + 15 - 45) million / 80 million
P0 = $7.78
Therefore General Industriesʹ expected current share price is $7.78
Answer:
False.
Explanation:
Alcohol is not digested like other foods. Once alcohol is swallowed, it travels down the esophagus into the stomach and the small intestine. It avoids the normal digestive process and goes right into the bloodstream.
<u>Explanation:</u>
First, remember that the difference between <em>normative and positive economic analysis</em> is that;
Normative analysis take a somewhat neutral view by stating how the world should be. While
The Positive analysis states the facts. That is, it describes the world as it is.
<u>
Thus, a </u><u>Normative analysis</u><u> of the consequence of minimum wage would be the following statements:</u>
c. In some cities such as San Francisco and New York, it would be impossible for low−skilled workers to live comfortably in the city without minimum wage laws.
d. The gains to winners of a minimum wage law should be valued more highly than the losses to losers because the latter primarily comprises businesses.
<u>And a </u><u>Positive analysis</u><u> of the consequence of minimum wage would be the following statements:</u>
a. The minimum wage law causes unemployment.
b. A minimum wage law benefits some groups and hurts others.
Answer:
The operation manager would want the inventory in front of process A based on the lean system.
Explanation:
To fully understand the basis on which we chose the answer, we need to define what a lean system is.
A Lean system refers to a business process plan. More a of business model canvass that meticulously deal with business process plan and development for the purpose of achieving maximum value in production, client and customer satisfaction while still at a reduced cost of running business. It should also be noted that the lean system is mostly a continuum of existing process and subsequent process progress are mostly determined by the level of integrity attained by the primary design stage.
With the understanding gotten from the definition above, it then obvious from the narrative of the question that the process is consecutive. As such, follows a pattern of A to B to C and thus the level of integrity of process design achieved at A will be passed down to B and C.
This is the more reason why the operation manager will prefer to to want an inventory at A which is the primary point of start.