Answer:
Step-by-step explanation:
Given:
x = 2cost,
t = (1/2)arccosx
y = 2sint
dy/dx = dy/dt . dt/dx
dy/dt = 2cost
dt/dx = -1/√(1 - x²)
dy/dx = -2cost/√(1 - x²)
Differentiate again to obtain d²y/dx²
d²y/dx² = 2sint/√(1 - x²) - 2xcost/(1 - x²)^(-3/2)
At t = π/4, we have
(√2)/√(1 - x²) - (√2)x(1 - x²)^(3/2)
Answer: 9
Step-by-step explanation:
3-2x-3
2x-3=-6
3--6=3+6=9
Answer:
I think its 90
Step-by-step explanation:
3x plus 1x is 4x divide 180 but 4 and get 45 so that meab there are 135 and 45
you need 90 more analysts to have a 1 to 1 ratio
Answer:
The right answer is neither
Step-by-step explanation:
I said because Exponential describes a very rapid increase. ... Exponential is also a mathematical term, meaning "involving an exponent." When you raise a number to the tenth power, for example, that's an exponential increase in that number. the part involves exponent is the y part same number multiple to it self to get the next answer while the x part one specific number to get the next number which is linear but since theyre asking about the relationship it’s neither because both were supposed to have the same relationship linea for x and y or exponential for x and y but they both are different.
Answer:
1.5 batches take 12.375 hour
Step-by-step explanation:
The first batch takes 10.5 hours, meaning only .5 batches are left. You then take the time that each new full batch takes (4.25) and divide it by 2 as you only need half of one batch. Meaning 0.5 of a batch takes 2.125 hours. You then take the time of the two batches (10.5, and 2.125) and add them, leaving you with 12.625. Meaning 12.375 is the most viable answer.