11 squared is 121
20 squared is 400
121+400= 521
The approximate square root of 521 is approximately 22.8254
Answer:
23 days
Step-by-step explanation:
We are told that the stadium holds 7500 individuals.
Now, if 600 seats have already been made, It means the number of seats left to be made to complete the stadium = 7500 - 600 = 6900 seats
We are told that 300 seats can be made in a day. Thus, number of days to be used to finish the remaining seats = 6900/300 = 23 days
Thus, it will take 23 days to complete all the 7500 seats.
Answer:
A
Step-by-step explanation:
gimme brainliest
Answer:
It should be the second one
Step-by-step explanation:
Answer:
Step-by-step explanation:
First, turn the word problem into an equation:
n(a number) was divided by 2

followed by this quotient beying multiplied by 4
*4
the product was added to 9
*4+9
the total sum was 25
*4+9 = 25
use PEMDAS to solve the equation
subtract 9 on both sides
*4 = 16
cancel the 2 and the 4 using factorization
n*2 = 16
divide 2 on both sides
n = 8