<span>1. Practice safe sex: Always make sure to talk about your sexual history with your new sexual partner prior to engaging in sex. If you are non-monogamous, use condoms every time. Encourage your sexual partner to join you in getting an STD test. This is important for short-term and long-term health because it can affect the ability to have children in the long term and also decrease risk for contracting an STD in the short-term.
2. Drink water: Being hydrated is important in the long-term for maintaining a healthy reproductive system. Vaginal dryness can be caused/or worsened by dehydration, which can make sex less comfortable and increase risk of infections.
3. Get annual checkups: this is a long-term benefit. It can help catch any potential problems while they are early to prevent them from becoming much more serious.
4. Be conscious about using toxic chemicals. Another long-term goal is to stay away from ttoxins lie dioxin, phthalates, PFCs, and pesticides. These chemicals can cause reproductive problems that could negatively influence the ability to have a healthy pregnancy.</span>
<u>Calculation of raw materials cost added to the work in process inventory account during the period:</u>
Raw materials issued using materials requisition 1445 for Job 101 = $25,000
Add: Raw materials issued using materials requisition 1446 for Job 102 = $35,000
Add: Materials requisition 1447 used on multiple jobs 1= $30,000
Total raw materials cost added to the work in process inventory account during the period =<u> $90,000</u>
Answer:
$24,000
Explanation:
According to the consignment accounting, it States that any inventory sent on consignment by the consignor to the consignee, belongs to the consignor until the inventory is sold by the consignee.
Regarding the above, Mogu company sent inventory costing $100,000 and out of this, only $76,000 has been sold. The remaining inventory still belongs to the consignor and the amount of this inventory is;
$100,000 - $76,000 = $24,000
Therefore, Mogul would report $24,000 worth of inventories at year end.
I believe it would be C.) multiple installations of gas, water, and electric lines
Answer:
False
Explanation:
A Gantt chart is named that way because it was originally developed by Henry Gantt. A Gantt chart represents a project schedule and it depicts the relationship between the activities that are being carried out and their schedule status. It includes the start and finish dates of the project's main activities, tasks, dependencies and milestones.