Answer:
9.08 hours
Step-by-step explanation:
in order to fill 1 pool
fill rate by pipe = 1 pool / 15 hours = 1/15 pool per hour
fill rate by hose = 1 pool / 23 hours = 1/23 pool per hour
combined rate = fill rate by pipe + fill rate by pool
= 1/15 + 1/23 = 38/345 pool per hour
since:
38/345 pool -----------> will take 1 hour
1 pool --------------------> will take 1 hour x (345/38) = 9.08 hours
Answer:
What grade is this for.
Step-by-step explanation:
Perimeter=sum of side lengths...
P=2L+2W
P=2(L+W), in this case L and W are 30 and 40 so
P=2(30+40)
P=2(70)
P=140
So 140 feet of fencing is needed to replace the fence.
The amount of sod needed is equal to the area which is LW
A=30(40)=1200 ft^2
Answer:
Slope is 6
Step-by-step explanation: