Answer:
Document the solution
Explanation:
In the following scenario, we should document the solution in the next troubleshooting strategy because when a user states that the meeting room projector has problems with the monitor when it is attached to his laptop. While finding the following cause and fixing the problem entirely, the projector shows the images correctly on both the laptop and the projector.
So, we should document the solution in our next troubleshooting strategy.
Answer:
Some
Explanation:
If it's a smart watch, then it has a built-in computer.
Answer:
When implementing a 1:1 relationship, the foreign key should be placed on the optional side if one side is mandatory and one side is optional.
When this is implemented, the foreign key should be made mandatory.
Explanation:
A foreign key (FK) is a primary key (PK) in relational databases. It is used to establish a relationship with a table that has the same attribute with another table in the database. A mandatory relationship exists when the foreign key depends on the parent (primary key) and cannot exist without the parent. A one-to-one relationship exists when one row in a data table may be linked with only one row in another data table.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.