Pick any value in the y column of the table. I'm going to pick 81. Divide the value you picked by the previous y value, which in my case would be 9
Dividing the values gives: 81/9 = 9
So the base is 9. We multiply each y value by 9 to get the next y value
Eg: to go from 1/81 to 1/9, we multiply by 9. Same for 1/9 to 1, and so on.
Answer: Choice B) 9
Note: This trick only works because x is increasing by 1 each time
I feel that the answer is length=1 width=8 and height=6
Answer:
Step-by-step explanation:
Given that a professor sets a standard examination at the end of each semester for all sections of a course. The variance of the scores on this test is typically very close to 300.
(Two tailed test for variance )
Sample variance =480
We can use chi square test for testing of hypothesis
Test statistic =
p value = 0.0100
Since p <0.05 our significance level, we reject H0.
The sample variance cannot be claimed as equal to 300.
Answer: 0.01
Step-by-step explanation:
0.0082 / 0.82 = 0.01
0.82 × 0.01 = 0.0082
Answer:13 miles
Step-by-step explanation:10.20-1.75=8.45÷0.65=13