Answer:
1256 cubic yards of sand.
Step-by-step explanation:
In this question we have to find the volume of cone formed by sand.
Height of the cone is = 36 feet
Radius of the cone = 60/2 =30 feet.
Now we know the formula of volume of cone v = π r² (h/3)
By putting the values of r and h we can get the volume of sand to spread.
Volume = π×(30)²×(36/3) = 3.14×900×12 feet³
= 33912 feet³
Now we will convert feet³ to cubic yards
Since 1 cubic feet = .037037 cubic yards
therefore 33912 cubic feet = 33912×.037 = 1256 cubic yards.
So the answer is 1256 cubic yards of sand has the department received.
In order to figure this out, you must solve the equation.
1-6x=7 (given)
-6x=6 (subtract 1 from both sides)
X=-1 (divide both sides by -6)
The answer is no.
Answer:
C
Step-by-step explanation:
This is the shows the constant value on the X-axis
Answer: 45 tell me if im wrong
Step-by-step explanation:
Answer:
10
Step-by-step explanation:
2x5 is basically 1x5= 5x2=10