Answer:
0.11685
Step-by-step explanation:
Given that :
Mean, p= 6% = 0.06
x = 8%,, x = 0.08
Probability that over 8% will not make timely payment :
Standard deviation (σ) = sqrt[(pq) /n]
q = 1 - p = 1 - 0.06 = 0.94
σ = sqrt[(0.06*0.94)/200)] = sqrt(0.000282) = 0.0167928
Obtain the Z score :
P(x > 0.08) = (0.08 - 0.06) / 0.0167928
P(x > 0.08) = 0.02 / 0.0167928
P(x > 0.08) = 1.1909826
P(Z > 1.1909) = 0.11685 (Z probability calculator)
Answer:
480
Step-by-step explanation:
time all of them
Answer:
In 4 months Wyatt offer an equal number of sandwiches and tacos.
Step-by-step explanation:
We are given the following in the question:
Types of sandwiches = 8
Rate of increase of sandwich = 1 per month
Thus, number of sandwiches in x months will be given by

Types of tacos = 4
Rate of increase of tacos sandwich = 2 per month
Thus, number of tacos in x months will be given by

Equating the two equations, we get,

Thus, in 4 months Wyatt offer an equal number of sandwiches and tacos.
The length of arc PS from the information given in the task content is; 31.5 ft.
<h3>What is the length of the arc PS?</h3>
It follows from the task content that;
- Point T is the center of the circle and line TR is the radius of the circle.
- Additionally, the angle subtended by arcPS = 180 - m<PS = 180 - 16 = 164⁰. This follows from the fact that line PR is a diameter.
On this note, the length of arc PS is;
arc PS = (164/360) × 2 × 3.14 × 11.
arc PS = 31.5ft.
Read more on length of an arc;
brainly.com/question/2005046
#SPJ1
Answer:
It is not correct, the answer is 15
Step-by-step explanation:
They forgot the rule of PEMDAS, and accidentally subtracted before they multiplied. It should've gone
(25+3) - 7 x 3 + (2x4)
28-7x3+8
28-21+8
Since it's minus 21, that means it's negative, so -21+8=13
28-13=15