Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Divide each term by <span>4</span> and simplify.Tap for less steps...Divide each term in <span><span><span>4x</span>=y</span><span><span>4x</span>=y</span></span> by <span>44</span>.<span><span><span><span>4x</span>4</span>=<span>y4</span></span><span><span><span>4x</span>4</span>=<span>y4</span></span></span>Reduce the expression by cancelling the common factors.So your answer would be x=y over 4
The answer is <em>x</em>=5.
Solve for <em>x</em>. (The question mark should be <em>x</em>.)

Answer:
see explanation
Step-by-step explanation:
The average rate of change of f(x) in the closed interval [ a, b ] is

Here [ a, b ] = [ 4, 7 ], thus
z = 
First you would add the two angles together to get 105. The. you do 180-105 to get 75. That is the missing angle. From there you would correspond the angles with the sides. Therefore the answer is Angle AB, angle BC, angle CA. these are in order from shortest to longest