Answer:
95.64% probability that pledges are received within 40 days
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that pledges are received within 40 days
This is the pvalue of Z when X = 40. So



has a pvalue of 0.9564
95.64% probability that pledges are received within 40 days
Answer:
4
Step-by-step explanation:
Answer: n + (n + 2) = 84
Step-by-step explanation:
If n is the smallest integer, the other integer must be two more than that, because it has to be odd. The two numbers add up to 84, so the other side of the equation is 84.
Answer: i have no idea, but i wish you the best!!!! ;)
Step-by-step explanation: