Answer:
$44.10
Step-by-step explanation:
Equation: 52+(52•.20) that is the first part for your answer you should get 10.4 or $10.40. Then you would take 52-10.4=41.60 then keeping that number in mind you do 41.60• .06 and get, rounded, 2.50. Then you would add 41.60+2.50 and get $44.10 as your answer.
Have a nice day and stay safe, all love from jen <3
Answer: 1.75
Step-by-step explanation:
5.25 / 3 = 1.75
1.75 x 4 = 7
7 + 5.25 = 12.25
1.75 x 7 = 12.25
since they are the same answer it's right
Answer:
See below
Step-by-step explanation:
Vertices are the black dots of the figure:
Point Q is at (1,4)
Point R is at (3,-2)
Point S is at (0,-1)
Point T is at (-2,2)
X would be equal to time and y be equal to distance
The y axis would be measuring distance and the x axis would be measuring time. Another name for a speed graph is the distance time graph. The y axis would be measuring the distance covered by the truck in meters and the x axis would be for the time it takes to reach that distance in second.
B) 2-6 would represent contact motion, meaning the vehicle is at rest. The time would be increasing from 2-6 to however the distance remains the same which is 20m