Answer:
a
Step-by-step explanation:
28/7=4
24/8=3
Answer:
a) z = 1.16
b) P(x ≥ 2) = 0.8508
c) z = 1.555
Step-by-step explanation:
a) Find z such that 87.7% of the standard normal curve lies to the left of z.
Lies to the left, so it has a pvalue of 0.877. This is z = 1.16
b) Assume that x has a normal distribution with the specified mean and standard deviation. Find the indicated probability.
μ = 2.4; σ = 0.35
P(x ≥ 2) =
This is 1 subtracted by the pvalue of Z when X = 2, in which



has a pvalue of 0.1492.
So
P(x ≥ 2) = 1 - 0.1492 = 0.8508.
c) Find z such that 6% of the standard normal curve lies to the right of z.
To the right, so z has a pvalue of 1-0.06 = 0.94%. So z = 1.555.
The slope of the line is 2
Answer:
2, 5, 11, 23, 47, 95, 191, 383, 767.
Step-by-step explanation:
This sequence is 2, 5, 11, 23, 47, 95, 191, 383, 767 because as you may notice, 2+ 3 =5, double the 3 to get 6. 5+ 6 =11, double the 6 to get 11 + 12 =23, etc.
Double the factor and add it to the previous term to get your next term and so forth.
The factors of 891 are 1,3,9,11,27,33,81,99,297,891
Because
1 x 891,
3 x 297,
9 x 99,
11 x 81,
27 x 33,
Hope I can help you :)